EVM EnStick 64GB USB 3.2 Gen 1 Pendrive with Durable ABS Casing, Shock & Drop Resistant (Green)
Original price was: $7.08.$2.12Current price is: $2.12.
1000 in stock
Description
<b>64GB Storage Capacity</b><br><b>Performance Read (Max.):</b> up to 100MB/s<br><b>Performance Write (Max.):</b> up to 30MB/s<br><b>Interface:</b> USB 3.2 Gen 1<br><b>Compatibility:</b> USB 3.2 Gen 1<br><b>Operating Temperature:</b> 0oC to 65oC<br><b>Storage Temperature:</b> -40oC to 85oC<br><b>Major IC Chipsets</b><br><b>Universal Compatibility</b><br>





Reviews
There are no reviews yet.