EVM EnPlug 38W Car Chager with Power Delivery Quick Charge, Dual Charging Port (EVM-CCR-04)

Original price was: $4.35.Current price is: $2.00.

1000 in stock

Description

<b>38W Fast Charging</b><br><b>Imported Smart Chip</b><br><b>Input:</b> DC 12-24V / 3A<br><b>Type-C Output:</b> DC 5V/2.4A 5V/3A, 9V/2.22, 12V/1.5A (20W Max.)<br><b>USB A Output:</b> DC 5V/3A; 9V/2A; 12V/1.5A (18W Max.)<br>

Specifications

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “EVM EnPlug 38W Car Chager with Power Delivery Quick Charge, Dual Charging Port (EVM-CCR-04)”

Your email address will not be published. Required fields are marked *

TOP
Bestsellers:
SHOPPING BAG 0
RECENTLY VIEWED 0
Added to wishlist!